Warehouse Mezzanine Mezzanine Floor Racking System

Product Description

Product Description

H beam steel mezzanine platform

H beam steel mezzanine platform adopts H-type steel and cross beam as the major supporting for the steel panel. Usually we use the steel panel or MDF panel for the mezzanine floor, there are also with staircase and guardrail. Match with the cargolift for the efficiency.

It is suitable for the higher warehouse, large loading capacity, longer span and large storage, it will be full use of the space, one warehouse used as two warehouse. Widely be used for the electronics products, hardware, communication and printing, etc.

Specifications

Parameter Details
Raw-Material High-Quality Q235 Cold rolled steel
Color Upright frame is blue, Beam is orange, can be customized.
Height Customized
Wide/Depth Customized
Length Customized
Loading Capacity 200~5000kg per sqm
Treatment Surface Powder coated
Packing Term Air bubble, Wooden Case, etc.

Key Structural Connections

Upright & Main Beam Connect

Both of them are H-steel. Its loading capacity is high and span is long. The major beams are connected by connector piece in each side. It will make the beams more stable.

Upright and Main Beam Connection

Support Beam & Main Beam Connect

They are connected with the hanging piece. And the hanging piece is welded on the main beam. So the major beam is more stable.

Support Beam Connection

Steel Panel & Guardrail Connect

Steel panel and support beam are connected with hooks. It is very stable. The guardrail hangs on the main beam without holes on the beam. So there is no bad influence on the beam.

Steel Panel Connection

Detailed Images

Detail 1 Detail 2 Detail 3
Detail 4 Detail 5
Detail 6 Detail 7 Detail 8

Product Overviews

Overview 1 Overview 2 Overview 3

Hot Sale

Heavy Duty Pallet Racking

Heavy Duty Pallet Racking

Medium Duty Rack

Medium Duty Rack

Mould Rack

Mould Rack

Cantilever Rack

Cantilever Rack

Mezzanine Floor

Mezzanine Floor

Wire Mesh Container

Wire Mesh Container

Warehouse Mezzanine Layout

FAQ

Are you a manufacturing or trading company?
We are a professional racking manufacturer.
What's the material of the rack?
Our material is Q235B cold rolled steel.
What is the delivery time?
Less than 15 workdays in general. It also depends on the order quantity and shelving design.
What is the term of payment?
30% T/T down payment and 70% T/T before delivery.
How can I get a quick quotation on my racking project?
For a quick quotation, please let us know the follow information:
1). The size of rack: Length* Depth*Height.
2). Layers per set.
3). Load capacity per beam layer.
4). Racking quantity.
How does your factory do regarding quality control?
Quality is priority. We have ISO 9001 2001 certifications.

Related Products