H beam steel mezzanine platform adopts H-type steel and cross beam as the major supporting for the steel panel. Usually we use the steel panel or MDF panel for the mezzanine floor, there are also with staircase and guardrail. Match with the cargolift for high efficiency.
It is suitable for the higher warehouse, large loading capacity, longer span and large storage. It will make full use of the space, turning one warehouse space into two. Widely used for electronics, hardware, communication, printing, and more.
Upright & Main Beam Connect
Both of them are H-steel, offering high loading capacity and long spans.
The major beams are connected by connector pieces on each side, making the overall structure exceptionally stable.
Q1What is the primary material used for the racking systems?
Our primary material is high-quality Q235B cold rolled steel, ensuring strong support and durability.
Q2What is the typical delivery time for orders?
Generally, delivery takes less than 15 workdays. The exact timeframe depends on the total order quantity and the custom shelving design.
Q3What are the standard payment terms?
Our standard terms are a 30% T/T down payment and the remaining 70% T/T due before delivery.
Q4How can I obtain a quick quotation for my racking project?
To get a fast quote, please provide the following details:
- Dimensions of the rack: Length * Depth * Height
- Number of layers/shelves per set
- Load capacity requirement per beam layer
- Total racking quantity needed
Q5Are product samples available?
Yes, we provide free product samples with the shipping freight collected.
Q6What packaging methods do you use?
Generally, racks are packed using air bubble film. Other customized options, such as wooden cases, are available upon request.