China Cheap Mezzanine Racking Custom Manufacturer Real Factory Certified Warehouse Mezzanine Floor Storage System for Sale

Product Description

Product Description
H beam steel mezzanine platform
Key Highlights

H beam steel mezzanine platform adopts H-type steel and cross beam as the major supporting for the steel panel. Usually we use the steel panel or MDF panel for the mezzanine floor, there are also with staircase and guardrail. Match with the cargolift for the efficiency.

It is suitable for the higher warehouse, large loading capacity, longer span and large storage, it will be full use of the space, one warehouse used as two warehouse. Widely be used for the electronics products, hardware, communication and printing, etc.

Raw-Material High-Quality Q235 Cold rolled steel
Color Upright frame is blue, Beam is orange, can be customized.
Height Customized
Wide/Depth Customized
Length Customized
Loading Capacity 200~5000kg per sqm
Treatment Surface Powder coated
Packing Term Air bubble, Wooden Case, etc.
Upright & Main Beam Connect

Both of them are H-steel, its loading capacity is high and span is long. The major beams are connected by connector piece in each side. It will make the beams more stable.

Upright & Main Beam Connect
Support Beam & Main Beam Connect

They are connected with the hanging piece. And the hanging piece is welded on the main beam. So the major beam is more stable.

Support Beam & Main Beam Connect
Steel Panel & Guardrail Connect

Steel panel and support beam are connected with hooks. It is very stable. The guardrail hangs on the main beam without holes on the beam. So there is no bad influence on the beam.

Steel Panel & Guardrail Connect
Detailed Images
Detail Image 1 Detail Image 2 Detail Image 3
Detail Image 4 Detail Image 5
Mezzanine details Mezzanine structure Mezzanine platform layout
Product Overviews
Overview 1 Overview 2 Overview 3
FAQ
Are you a manufacture or trading company?
We are a professional racking manufacturer.
What's the material of the rack?
Our material is Q235B cold rolled steel.
What is the delivery time?
Less than 15 workdays in general. It also depends on the order quantity and shelving design.
What is the term of payment?
30% T/T down payment and 70% T/T before delivery.
How can I get a quick quotation on my racking project?
For a quick quotation, please let us know the following information:
1) The size of rack: Length * Depth * Height.
2) Layers per set.
3) Load capacity per beam layer.
4) Racking quantity.
Are samples available?
We accept to send you free samples with freight collect.
Hot Sale
Heavy Duty Pallet Racking
Heavy Duty Pallet Racking
Medium Duty Rack
Medium Duty Rack
Mould Rack
Mould Rack
Cantilever Rack
Cantilever Rack
Mezzanine Floor
Mezzanine Floor
Wire Mesh Container
Wire Mesh Container
Industrial racking display

Related Products